NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

SE / EE digital stamps on all PV pages & PE Letter / Calcs. ALL SHEETS of plans and cover sheet of any calculations must be wet signed (electronic is OK) and dated by the person responsible for their preparation Provide complete layout for attachment of panel to the roof. Provide structure calcs to verify the adequacy of roof framing.

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

AC disconnect is required to be in the line of sight of the main breaker and within 10ft.

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Note/Detail on plans that the ESS shall be 3' minimum away for doors & windows into the dwelling

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements
  • Note on Plans: All PV equipment shall be listed by a recognized testing lab
  •  Provide documentation that the modules are Type 1, Type 2, Type 3 or Type 10 to meet Class A roof classification when installed with the racking system
  • 12/5/24 to prove the Class A roof classification add solarmount installation manual to planset
Roof Plan

* Show the required working clearances around the service meter main, AC Disconnect, Inverters and DC Disconnects. * Show the layout of PV mounting locations

Attachment Detail
  • Identify and show method of sealing the roof penetrations
  • Provide layout of rails and attachment point to the roof
  • Provide detail for mounting conduit bottom a minimum 7 /8" above the roof to omit the temperature adjustment factor for the feeders
Electrical Diagram

Standard

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

Ground Mounts: Fencing will only be required if the yard is not fenced.