City of Ione (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Provide a 3ft setback to any obstruction at all roof edges
Structural & loads
- Wind Speed
- 95
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Structural required if total combined weight of PV system exceeds 5 lbs PSF.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
* A sturdy, non-folding and non-telescoping extension ladder will be in place, secured to and extended above the roof at least two feet and be secured to the roof to provide access for all inspections. Also, the same type of ladder shall be in place and extend into the attic access for all attic inspections. * The contractor will be present for all inspections and have attic and all equipment, disconnects, main panel, and subpanels open and ready for inspection prior to the arrival of the inspector. *
- Attachment Detail
Attachment detail diagram to match actual array
- Electrical Diagram
Add to line diagram: PV GROUND TO BE CONNECTED TO GEC BY IRREVERSIBLE COMPRESSION CONNECTOR PER 690.48 - 250.64(c)
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim