Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Imperial Beach (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,MPU,Derate,Derate
How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

AHJ is now requesting PE calcs for residential projects.SE digital stamps on corresponding PV pages & PE Letter / Calcs.WS 110 MPH/ EXPOSURE CAT C

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

The city requires that no conduit be ran through any 3' fire access path ways. Use internal conduit runs with discretion Flat roofs are OK without internally ran conduit.

Roof Plan

****The city requires that no conduit be ran through any 3' fire access path ways. Use internal conduit runs with discretion**** ~~ ** **~~Per building official, staff, Imperial Beach _ **does not strictly require conduit to be ran through the attic**_. The only restriction they had was to not run our conduit through any of the 3' fire accesses on the roof. Use internal conduit runs with discretion. Flat roof homes (anything below 2:12) with or without parapet walls do not required internally ran conduit. CONDUIT TO BE RUN IN ATTIC @ 18" MINIMUM BELOW ROOF DECKING

Electrical Diagram

Conduits may not pass through the fire accessways so most of the conduit should be located in the attic space 18โ€ or more below the roof deck.

Ground mount

Ground Mount Fencing Required
No