City of Hermosa Beach (CA)
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- No PE required
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
- Panel Schedule Required
- All Projects
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Provide panel schedule for the main service panel
- Provide load calculations that match the panel schedule
- Add note to cover page stating all work shall comply with the most current Los Angeles County Fire Code
- Provide a scope of work on the title page for the ESS including number of stories, occupancy type, total number of ESS units, ESS models, and ESS locations
- Provide site plan note (if applicable) stating the project is not located in a fire hazard severity zone or state responsibility area and is exempt from CRC R377.6.2 and CBC 706A.2 requirements
- Provide 36-inch wide emergency escape and rescue pathways to qualifying doors and windows above the roof plane per CFC 1204.2.2
- No electrical components associated with the battery-integrated PV system shall be located above the roof decking within required emergency pathways
- Compliance with emergency pathways shall be subject to fire code inspection, including lifting roof tiles as required
- Provide a garage floor plan if applicable
- When ESS is installed inside a garage, the attached garage must comply with all applicable codes, standards, and the manufacturer’s installation manual, including fire protection features and alarm/detector requirements when available
- Exterior ESS units shall not be installed within 5 feet of windows, doors, or HVAC vents
- ESS units shall be installed no less than 3 feet from other ESS units
- Electrical Equipment Elevation (EEE) page is required
- Add note to EEE and SLD stating the battery is installed 5 feet away from doors and windows
- If no doors or windows are within 5 feet of the battery, indicate this on the elevation drawing
- Add note to ELD stating the ESS circuit breaker shall be secured by an additional fastener per 408.36(D)
- Circuit breaker and fastener must be manufactured by the same manufacturer
- Provide Cutler-Hammer or Square D breaker hold-down kit documentation
- Provide power source disconnect schedule including disconnect number and type
- Identify PV rapid shutdown disconnect (1 of 2)
- Identify ESS disconnect (2 of 2)
- Provide fire department electrical building placards for disconnects #1 and #2
- ESS disconnect must be within 6 feet of the main service panel, on the same wall, and not blocked by walls, gates, or obstructions
- Provide an accessible emergency service disconnect within 3 feet of the main service panel that shuts down all solar and battery systems
- Clarify how emergency services can shut down all PV and battery systems
- Emergency disconnect must comply with code sections 110.25, 705.22, 705.23, 705.31, 706.7, and 706.30
- Comply with California Fire Code 1206.2 requirements including battery room layout, fire-resistance assemblies, battery quantities and types, manufacturer specifications, energy management system details, signage, fire extinguishing and smoke detection systems, and seismic support
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Site
No equipment may be installed within 4ft of the property lines.
- Electrical Diagram
Standard
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim