City of Hercules (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45240
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Derate
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Batteries None are listed. Building-wire type cables used? [Chapter 3] NOTE: Welding cables, marine, locomotive (DLO), and auto battery cables don’️t meet the NEC. Flexible, listed USE, RHW, or THW cables are available. Article 400 flexible cables larger than 2/0 AWG are o.k. for battery cell connections, but not in conduit or through walls. [690.74 and 400.8] Flexible fine stranded cables require very limited, specially listed terminals. See stand-alone inverters for ampacity calculations. Access limited? [690.71(b)] Installed in well ventilated areas (garages, basements, out buildings, and not living areas)? NOTE: Manifolds, power venting, and single exterior vents to the outside are not required and should be avoided. Cables to inverters, dc load centers, and/or charge controllers in conduit? Conduit enters the battery enclosure below the tops of the batteries? [300.4] NOTE: There are no listed battery boxes. Lockable heavy-duty plastic polyethylene tool boxes are usually acceptable.
- Site
Secondary disco needed if battery is not in line of site of MSP
- County of Contra Costa requires a disconnect in line sight of MSP + An additional disconnect in line sight of ESS if ESS is not in line sight of MSP - Does not count internal PW3 disconnect as emergency disconnect
- If equipment is installed behind fence/gate or not in line sight of MSP, an additional disconnect should be installed next to the equipment
- Electrical Diagram
1. CONTRA COSTA STAMPS THIS SLD, SO PLEASE LEAVE ROOM FOR CONTRA COSTA'S 3.5 x 5 stamp.
- Custom Placards Required
- 1
- Placards Notes
Permanent placards from placard page of plan set
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim