City of Glendora (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45251
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
1
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
85
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Are structural calculations required for roof mount or ground mount solar? **_Commercial: Yes. Residential ground mounted: Yes. Residential roof mounted: Sometimes (depends on the existing structure and the design of the system)_**

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

Rapid shutdown shall be located at a readily accessible location outside the building

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

[LACOF]

This AHJ follows County of Los Angeles (ESS Requirements) (CA).

Please follow this link to County of Los Angeles (ESS Requirements) (CA)

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

Is a structural observation report required? _Typical no, but it would depend on the project and the structural design. Do ground-mounts require fencing around the array? _Typically no, but it would depend on the system and its location. Do ground mounts require soil samples? _Sometimes. It depends on the design and the location. What is the soil class for your area? _It depends on the location. The classification would be determined by a geotechnical investigation.

Cover Page

On the Title Sheet, please indicate if: a. The structure is located in FHSZ/WUI or not. If it is, please show compliance with CBC Chapter 7A/CRC Section R337. MC 19.06 b. The structure is in a Flood Hazard Area or not. If it is, please show compliance with MC 19.02.050

Attachment Detail

flashing is required. Flashing shall be installed as required per the roofing manufacturer’s listing.

Electrical Diagram

Load calculations required for de-rate of main breakers MPUs: SPD required. Please indicate the Surge-protector to be utilized and provide a cut sheet (UL 1449) listing.

Custom Placards Required
1
Placards Notes

Permanent main site plan placard + permanent disconnect/BOS placards

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

Do NOT build a GM on a hill. DCR - Moinian, Shahin

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Glendora (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.