City of Eastvale (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45007
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes - Battery,Yes - Existing PV
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
PV arrays shall be located at least 2h2 (2 times the maximum height of the modules above roof deck) from the roof edge, a gable ridge or a hip ridge
Structural & loads
- Wind Speed
- 102
- Wind Notes
Use ASCE7-16 , 26.5.1. Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
- BOS Restrictions
If the inverter is located inside, disconnecting means shall be provided within sight and within 10ftΒΈ of the equipment 690.15(A). 2nd AC disconnect is required when inverter is not within line of sight of MSP
Internal TPW switch can serve as 2nd disconnecting means.
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
If storage is installed garage, vehicle impact protection should be noted on plans
Provide a note on the plan that the battery is not to be located within 3 feet of a building opening
ESS disconnect required within 6ft of BATTERY on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
When the City states anything else other than Eastvale, change to Eastvale.
Please provide the Manufactures Cut Sheets for all of the equipment in the system including the racking system
Include solaredge documentation "PV Power Source Labelling" PDF uploaded below * Include "SM_Insallation_UL2703" PDF uploaded below
- Cover Page
*Indicate occupancy group (R3 for installing on a residence, U if installing on a miscellaneous structure like hangars, barns, garages, stables, sheds, & other farm buildings) * indicate a fire sprinkler system YES or NO
- Cover Page Notes
All Jobs [Seismic Design Category: D2 // the installer LLC SHALL INSTALL THE PROPOSED PV SYSTEM // BUILDING TYPE CONSTRUCTION VB]
- Site Notes
All Jobs [All new electrical equipment is to be no closer than 3 feet from the gas riser]
- Roof Plan
Show wind speed and exposure category on roof plan or roof details page
- Roof Plan Notes
All Jobs [EMT shall be securely fastened in place at intervals not to exceed 10β-0β. In addition, each EMT run between termination points shall be securely fastened within 3β-0β of each outlet box, junction box, device box, cabinet, conduit body, or other tubing termination.]
All Jobs [PV arrays shall be located at least 2h2 (2 times the maximum height of the modules above roof deck) from the roof edge, a gable ridge or a hip ridge]
- Attachment Detail
Call out max attachment span in both directions. Provide span tables for the racking system. The layout shall coordinate with the span tables. Specify rail size. Detail support mechanism used to connect EMT on/across the roof. The support mechanism shall accommodate a 1β min. clearance from the roof surface to the EMT and secured by an approved method.
- Electrical Diagram Notes
All Jobs [ INVERTER EQUIPPED WITH INTEGRATED ARC FAULT PROTECTION. REVIEW INVERTER SPECIFICATIONS FOR FURTHER INFORMATION // EXISTING AND NEW EQUIPMENT RATED FOR 10K AIC // PV SYSTEM IS EQUIPPED WITH INTEGRATED DC GROUND FAULT PROTECTION IN COMPLIANCE WITH CEC 690.41(B)(1) & 690.41(B). REFERENCE INVERTER SPECIFICATION FOR FURTHER DOCUMENTATION // GROUNDING ELECTRODE CONDUCTOR & BONDING JUMPER TO BE SIZED #8AWG THWN-2 // NEW ELECTRICAL SHALL BE LOCATED AT LEAST THREE (3) FEET FROM GAS METER OR GAS SHUT-OFF VALVES. CPC1208.7.1; CEC 110.26 // GROUNDING ELECTRODE CONDUCTOR SIZED PER 2025 CEC TABLE 250.66.]
- Label Page
Where multiple sources supply the building, the plaque or directory shall be marked with the wording "CAUTION: MULTIPLE SOURCES OF POWER"
- Custom Placards Required
- 1
- Placards Notes
Permanent main site placard + disconnect/BOS placards as listed on placard sheet of plans
Ground mount
- Ground Mount Fencing Required
- No