Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Cypress (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc


If ESS is not in line of sight of MSP an ESS disconnect required within 6ft of MSP


REMOVED ELEVATION REQUIRED DUE TO SOCAL UPDATE MEETING 11/13

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements


Cover Page Notes

Notes All Jobs

1.     Contractor shall be present during all inspections.

2.     A ladder shall be provided and secured to the structure at the approved roof access point per note "c" above with a Cal OSHA approved device during all inspections.

3.     The roof access point requiring a ladder shall not be located over a window, door or located where it conflicts with overhead obstructions such as tree limbs, wires or signs." CRC R324.7.1.

4.     Direct-Current Photovoltaic Source and Direct-Current Output circuits on or inside a building shall be contained in a metal raceway. The wiring methods shall comply with the additional installation requirements of CEC 690.31(G)(1) through (4)" CEC 690.31(G)

5.     Where a UFER cannot be verified or is not present, a Grounding Electrode system shall be installed as per CEC 250.53

6.      Roof-Mounted conduits and raceways shall be 7/8th's off of the roof deck or the stipulations of 310.15(B)(3)(c) shall apply.

7.     Any relocated conductors in the same conduit with more than 3 conductors and more than 2 ft. in length is subject to deration.

8.     Splices in the Main panel may not be done in the vertical section of the panel.

Site

Show location of gas meter on site plan and note minimum clearance of 3 fee required to new electrical equipment.

Site Notes

All Jobs

All interior garage wall mounted devices shall be mounted 36 above finished grade or have impact protection provided.

Roof Plan Notes

All Jobs

1.     Black module frames will be used at time of installation.

2.     All tubing, wiring, etc. will be concealed as much as possible. If exposed, it will be painted to match the adjacent surface.

3.      Modules will be low profile matching the house roof pitch.

Electrical Diagram

Provide conductor count and size for all conductors being used. Derates require EE stamps on load calcs


Notes:

1.     Any relocated conductors in the same conduit with more than 3 conductors and more than 2 ft. in length is subject to deration.

2.     Splices in the Main panel may not be done in the vertical section of the panel.

Electrical Diagram Notes

All Jobs

If any existing load conductors are extended more 6 feet, AFCI protection will need to be provided CEC 210.12(d).

Label Page

Provide a permanent warning label on the main panel that states:

"WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATINGS OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACTIY OF BUSBAR' "

Custom Placards Required
1
Non Standard Revision Requirements

ALL pages with changes must be red clouded. Even if you remove something from the plans you will need to red cloud what was removed

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Cypress (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.