City of Citrus Heights (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45218
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Derate
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Electrical
- Structural Calculations Required
- No
- Stamp Location On Plans
- Top Right
- Date On Stamps
- N/A
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Battery information and location
- Provide anchorage details for the ESS (battery system).
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
**DESIGN REVISIONS: ** If there is an Approved Fire Stamp Planset uploaded to Lightspeed's files section. the Code Years must match the approved Fire Stamp Plans.
**EXISTING SYSTEMS: ** Site placard needs to show all modules on the roof, new and existing.
Complete set of plans must include:
- Panel layout
- Panel information
- Battery information and location
- Battery anchorage details** Battery elevation
- Connections
- Single line Electrical Plan/Diagram
- Engineer Stamp/Mounting Rack Plans (Pre-engineer specs are accepted without Engineer Stamp)
- Specs
- Title 24
- Cover Page
SOLARAPP:
- Provide BOS locations on Site plan and Site placard.
- Include the dimensions for the property lines and from the home to the property lines. Provide location of ESS on scaled site plan.
- Site Notes
All Jobs [New electrical shall be located at least three (3) feet from gas meter or gas shutoff valves. CPC1208.7.1; CEC 110.26]
- Roof Plan
- Electrical Diagram
120% rule allowed per CEC 705.12(B)(2)(3)(d) The PV breaker must be located at the opposite end of the breaker panel from the main breaker and shall have the warning label installed next to it per Section 705.12(D)(G) . "WARNING INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE".
- Electrical Diagram Notes
All Jobs [The solar breaker to be positioned at the opposite end of the busbar from the main breaker per CEC 705.12(B) // Grounding electrode conductor shall be sized per CEC 250.66]
- Custom Placards Required
- 0
- Non Standard Revision Requirements
Provide anchorage details for the ESS (battery system).
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim