City of Chula Vista (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45098
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restriction Notes
Solarapp is not available for multifamily buildings
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Other
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+,Yes - Derate
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes - 10kW+
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
3' clearance around chimneys and overhead service.
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Conditional Criteria
- If the inverter is behind a fence/interior, a second AC disconnect shall be placed within sight of the inverter.
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Line Side Taps,Meter Adapter,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
Battery system must be shown on placard. Battery system needs Battery Disco.
Group disconnects together.
Provide mounting detail for the battery.
This must include: Exterior wall finish construction (if exterior mounted)
Distance from ESS to openings (doors, windows, vents) and eaves Must be 3' or greater.
Distance from ESS to MSP, gas meter, water heater. Must be 6' or greater.
Distance from ESS to other ESS and/or disconnects. Must be 5' or greater.
Disconnect within line of sighed of ESS and no closer than 5' away from ESS
If the ESS is subject to physical damage (ex. motor vehicles) it shall be protected with an approved barrier system, such as bollards.
Provide a 5' pathway with no obstructions from the street to the ESS or two 3' pathways.
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
If ESS is not located by the MSP, two ESS discos will be required to fulfill all of these requirements.
11/27 IF BATTERY IS LOCATED INSIDE THE GARAGE A HEAT DETECTOR SHALL BE INSTALLED INTERCONNECTED TO EXISTING SMOKE ALARM. ADD NOTE IN SITE PLAN: [BATTERIES ARE LOCATED IN GARAGE AND WILL REQUIRE A HEAT DETECTOR BE INSTALLED]
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
ALL JOBS:
- SPECIFIC TITLE BLOCK FORMATTING IS REQUIRED. THE PAGE NUMBERING MUST BE ENLARGED. SEE PROJECT ---> 549709 <--- FOR REFERENCE ON HOW TO DO THIS
- Must include Streamlined Packet if the project is 10kw or LESS, and NOT an add on system OR a multifamily home (duplex, etc). (Blank uploaded to the files below).
- Cover Page
INCLUDE NOTES ON COVER PAGE (DELETE WHAT DOESN'T APPLY)
- BUILDING OCCUPANCY TYPE - R2 (TOWNHOUSE, APARTMENT COMPLEX) OR R3 (SINGLE FAMILY DWELLING)
- FIRE SPRINKLERS PRESENT ON SITE - YES / NO
- NUMBER OF STORIES
- Cover Page Notes
MPU [SDGE work order shall be available on site at time of inspection]
- Site
ALL JOBS
- Must show property dimensions on site plan.
- PV disconnecting means shall be located at a readily accessible location
- If the inverter is behind a fence/interior, a second AC disconnect shall be placed within sight of the inverter.
- For duplexes and similar multi-unit homes, show on the roof the boundaries of the unit(s) we are installing on.
BATTERY JOBS:
- Site plan must show 5' clear path from street to ESS
- Attachment Detail
FLAT ROOF
- List the height of parapet walls on flat roofs (if any) in the plans. If array taller than the parapet wall, additional calculations required.
- Electrical Diagram
- Electrical Diagram Notes
MPU [SDGE work order shall be available on-site at the time of inspection // All services supplying dwelling units shall be provided with a surge-protective device (SPD) at the main service panel of the 2025 California Electrical Code]
- Label Page
ALL JOBS:
- HOUSE MODEL MUST ALWAYS BE ORIETNTED SO THE MSP IS ON THE BOTTOM
BATTERY OR EXISTING SYSTEMS:
- TRI POWER SOURCE LABEL REQUIRED
- Custom Placards Required
- 1
- Placards Notes
Required for all jobs
- PLACARD: ROTATE PLACARD SO THE MSP IS ALIGNED WITH THE BOTTOM
- Directional placard shall be oriented relative to where an individual will be standing looking at the placard. Meter panel to be at the bottom of placard when oriented correctly.
Ground mount
- Ground Mount Fencing Required
- Situational
- Ground Mount Notes
GM setbacks vary with each property according to AHJ
Please specify the ICC approval number of equal for the ground mount system or provide structural calculation by California licensed civil engineer.
Please specify the required foundation pier depth
Show how you intend to limit accessibility of children to exposed module wiring on ground mounted PV arrays.
Please provide statement (narrative) on plans addressing this issue.