City of Cerritos (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes - Derate
- Wet Stamps Required
- Digital Electrical,Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
EE Stamp needed when derating
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
Please follow this link to County of Los Angeles (ESS Requirements) (CA)
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
HOME ELEVATION PAGE REQUIRED FOR ALL JOBS
- CLEARLY ILLUSTRATE THE LOCATION AND LABEL ALL PV EQUIPMENT
- PV MODULES SHALL BE ILLUSTRATED ON ELEVATION PAGE, LAYOUT MUST MATCH WHAT WE WILL ACTUALLY INSTALL
- CONDUIT RUN SHALL BE ILLUSTRATED AND LABELED ON ELEVATION PAGE
AHJ DOES NOT ACCEPT BUS CERTS
- Roof Plan
ILLUSTRATE CONDUIT RUN ON ROOF PLAN
- A MAXIMUM OF 5' OF CONDUIT CAN BE PLACED ON THE ROOF, OR IT MUST ALL GO IN THE ATTIC
- Roof Plan Notes
All Jobs [CONDUIT TO BE PAINTED TO MATCH THE EXTERIOR SURFACE // MSP IS RECESS/FLUSH MOUNTED (โ DELETE WHAT DOES NOT APPLY)]
- Electrical Diagram
MPU: ADD NOTE : Cold water within 5 feet and at least 1 supplemental electrode is required.
250.68(C)(1) Metal Underground Water Pipe: Indicate the connection to the interior metal water piping shall be made within 5 ft from the point of entrance. Per Section 250.68(C)(1).
(B) If using ground rods, provide two rods spaced 6ft apart.
- Electrical Diagram Notes
Battery [THE ESS CIRCUIT BREAKER SHALL BE SECURED IN PLACE BY AN ADDITIONAL FASTENER PER SECTION 408.36(D). THE BREAKER AND FASTENER SHALL BE MADE BY THE SAME MANUFACTURER // THE BACKFEED BREAKER SHALL BE LOCATED AT THE OPPOSITE END OF THE MAIN BREAKER OR INPUT FEEDER.]
- INCLUDE DATA SHEET FOR BREAKER Hold Down Kit / Additional Fastener
- Label Page
Label page must include conduit run
Clearly label as conduit and list length of each run
Requires both LAFD ___ out of ____ placards and also the small individually numbered yellow placards.
- Label Page Notes
- Custom Placards Required
- 1
- Non Standard Planset Requirements
- Home Elevation,BOS Elevation
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim