City of California City (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 130
- Wind Notes
- Snow Load
- 5
- Snow Load Notes
Design Criteria:
- Wind Design Speed: 130 mph (Risk Category II Structures)
- Ground Snow Load: 9.1 PSF
- Seismic Design Category: D1
- Roof Live Load: 20 PSF
- Wind Exposure: C
- Windborne debris zone: Yes
- Other structural and environmental parameters
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
ESS disconnect required within battery of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
Please fill out Solar Checklist, Solar Structural Info and Solar Standard Inverter Permit Application
- Cover Page
- Cover Page Notes
All Jobs [Wind Speed: 130]
- Electrical Diagram
120% rule allowed per CEC 705.12(B)(2)(3)(d) The type of grounding for the MSP (rod, ufer, etc) and the size of the GEC is required on the line diagram. Indicate with a
note whether the service is an overhead or underground feed
- Electrical Diagram Notes
All Jobs [THE EXISTING GROUND SYSTEM WILL BE REPLACED WITH A NEW SYSTEM IF EXISTING GROUND SYSTEM IS NOT UP TO CURRENT CODES]
- Custom Placards Required
- 1
- Placards Notes
Permanent placards reflecting placards listed on placard page of plan set
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim