Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Benicia (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Electrical,Digital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
44495
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Electrical,Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes

EE digital stamps on residential load calcs and ELD.

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

PE Requirements; SE digital stamps on corresponding PV pages & PE Letter / Calcs.

Do you require structural calculations for residential solar? Depending (a past project approved w/o structural calcs/stamps and is a "truss". Per structural criteria, trusses are limited to 4' so it appears AHJ ignores this part. Sending a past project & Christine w/o calcs to confirm trusses do not need structural) a past project & Christine (trusses) were approved without structural.

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
All Jobs
Allowed POI
Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Add Tri-Power Source label

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Electrical Load Calcs needed for all projects. Standard - Just fill out structural criteria uploaded below.

The City of Benicia now requires EE stamped load calcs and stamped SLD for Center Fed mains.

Electrical Diagram

120% rule allowed per CEC 705.12(B)(2)(3)(d)

Electrical Diagram Notes

Provide information on the MSP. Size of buss bar in amps, is there a main OCPD, if so what size, if not is it a hot buss panel.


In the electrical diagram show the point of connection, how the point of connection is being made, along with the necessary calculations. CEC705.12.


Show compliance with CEC 707.16(F) Stand-Alone Operation/710.15(F) Back-fed Circuit Breakers/408.36(D) Back-Fed Devices. Show the required additional attachment for the breakers. 


Show the maximum size of the load that may be backed up. Show compliance with CEC 707.16(F) Stand-Alone Operation/710.15(A) Supply-Output. 

Custom Placards Required
1
Placards Notes

If multiple ESS onsite - special placards need to name batteries as 'Battery 1' 'Battery 2' etc

Ground mount

Ground Mount Fencing Required
Situational
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Benicia (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.