City of Bellflower (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Load Side Taps,PV Breaker,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
- Please follow this link to County of Los Angeles (ESS Requirements) (CA)
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
NEW AHJ REQUIREMENTS The APN, Lot, and Zone must be provided PER DCR HARRAL, SCOTT -SEE EXAMPLE BELOW APN: 6280-028-037 Lot: +- 6.368 Zone: SF Scoutred: https://scoutred.com/maps/@32.7452,-117.0967,17.00 (https://scoutred.com/maps/@32.7452,-117.0967,17.00) ParcelQuest Link (https://assr.parcelquest.com/Home):
- Cover Page
**APN: ** **LOT: ** **ZONE: ** **CONSTRUCTION TYPE:V-B ** **OCCUPANCY GROUP:R-3, U ** **FIRE SPRINKLER SYSTEM:** **NUMBER OF STORIES: ** **HEIGHT OF THE STRUCTURE FROM GRADE PLANE TO TOP ROOF PEAK:** Example: a past project APN: 6280-028-037 LOT: +- 6.368 ZONE: SF CONSTRUCTION TYPE:VB OCCUPANCY GROUP:R-3 FIRE SPRINKLER SYSTEM:YES https://assr.parcelquest.com/Statewide/Details/0
- Cover Page Notes
All Jobs [The general contractor is to verify the existing smoke and carbon monoxide alarms prior to final inspection]
- Site
Per Velarde, Bernabe DCR must label all structures on site plan.
1/17/24 The branch circuits are to be identified by module on the site plan
AHJ requires we label all structures on site plan and show the square footage of these structures. This includes storage sheds
- Site Notes
MPU [SCE is to verify and approve the location of the new/upgraded main panel. A receipt of approvals is to be provided to the city inspector.]
Battery [Ventilation is required when the battery produces hydrogen or other flammable gases during charging (Lithium-ion batteries DO NOT off gas flammable gasses during charging) // Illumination shall be provided at ESS // ESS shall be located not less than 3ft from doors or windows]
- Roof Plan
Roof access point to be shown on plans Identify stringing on roof plan
- Roof Plan Notes
All Jobs [Existing B-vent terminations, for fuel burning appliances, where adjacent to the proposed modules, must be extended 12" above the modules' top surface. // Existing DWV plumbing vent terminations that are located closer than 12" horizontally from the proposed modules, must be rerouted to be extended 6" minimum above the top surface of the modules to comply with CPC 906.1]
- Electrical Diagram
Please show/note the AIC rating for the new main breaker and solar breaker shall haie an equal or greater AIC ratings than the existing breakers. CEC 690.13(E). or by other means of showing the PV system is rated for the available fault current. CEC 110.9, 110.10 For breaker tie-ins clarify on the plans “the PV breaker shall be located at the opposite end of the busbar from the main breaker.
- Electrical Diagram Notes
All Jobs [New electrical shall be located at least three (3) feet from gas meter or gas shut- off valves. CPC1208.7.1; CEC 110.26 // The wire size and type of the service feeding conductor for the main service panel shall be determined by the utility provider. // Grounding electrode conductor shall be sized per CEC 250.66.]
- Custom Placards Required
- 1
- Placards Notes
Permanent main site plan placard + BOS/Disconnect Placards as listed on approved plans
- Non Standard Revision Requirements
All changes to be clouded, if system info changes, the system info box on the cover page is to be clouded also.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim