City of Banning (CA)
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTesting
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 4
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
They have adopted the new CalFire 2016 code affecting the setback rules.
Structural & loads
- Wind Speed
- 130
- Wind Notes
Exposure Category C
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE digital stamps on corresponding PV pages & PE Letter / Calcs. WS: 130mph. Exposure C. SL: 5psf
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
- All PV equipment must be at least 36” away (laterally) from all other equipment, obstructions, edges, grounded surfaces, etc.
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
- Cover Page Notes
All Jobs [City of Banning Electric Utility will install a City owned PV Gross meter and activate the PV system after it meets all requirements and passes all inspections. // Authority having jurisdiction // Fire authority having jurisdiction]
- Site
- Roof Plan
- Must list clearly if there is no other equipment, obstructions, grounded surfaces (i.e. fences, gas meter, A/C unit, edges, doors, windows, etc.)
- Electrical Diagram
- Existing systems: remove the (E) PV production meter and place the (N) one in between the combiner panel and the MSP
- Label Page
General
- Material: metal or plastic, red w/ white lettering.
- Letters: engraved, machine-printed, or electrophoto plating.
- Size: min 2"x5", max 3"x6" (except directory placard).
- Font: Arial, size 12-28.
AC Disconnect
- “Nominal Operating AC Voltage” + value.
- “Utility Interaction Point AC Disconnect.”
Main Service Panel
- Dual Power Supply Photovoltaic System label required.
- Label must be on main service panel cover.
- Warning label next to or below solar breaker.
Directory Placard
- Location: customer side of service panel, visible, not covering manufacturer labeling.
- Must show: PV module qty, manufacturer, model and Inverter qty, manufacturer, model.
- Custom Placards Required
- 1
- Placards Notes
- Use approved plaques (see plaque page on approved plans).
- Placards must list inverter + panel make & model.
- All placarding per SO 600-83, 84, 85, 86 (size, font, location, qty, manufacturer, model, equipment, conduit runs, etc.).
- Directory Placard + plans must show installed equipment locations.
- Non Standard Planset Requirements
- Single Line Diagram,BOS Elevation
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
- At this time, the City of Banning does not allow the ground installation of solar facilities for commercial purposes in any zone.