NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTesting
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Testing
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
4
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

They have adopted the new CalFire 2016 code affecting the setback rules.

Structural & loads

Wind Speed
130
Wind Notes

Exposure Category C

Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

SE digital stamps on corresponding PV pages & PE Letter / Calcs. WS: 130mph. Exposure C. SL: 5psf

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions
  • All PV equipment must be at least 36” away (laterally) from all other equipment, obstructions, edges, grounded surfaces, etc.

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements


Cover Page Notes

All Jobs [City of Banning Electric Utility will install a City owned PV Gross meter and activate the PV system after it meets all requirements and passes all inspections. // Authority having jurisdiction // Fire authority having jurisdiction]

Site


Roof Plan
  • Must list clearly if there is no other equipment, obstructions, grounded surfaces (i.e. fences, gas meter, A/C unit, edges, doors, windows, etc.)
Electrical Diagram
  • Existing systems: remove the (E) PV production meter and place the (N) one in between the combiner panel and the MSP
Label Page

General

  • Material: metal or plastic, red w/ white lettering.
  • Letters: engraved, machine-printed, or electrophoto plating.
  • Size: min 2"x5", max 3"x6" (except directory placard).
  • Font: Arial, size 12-28.

AC Disconnect

  • “Nominal Operating AC Voltage” + value.
  • “Utility Interaction Point AC Disconnect.”

Main Service Panel

  • Dual Power Supply Photovoltaic System label required.
  • Label must be on main service panel cover.
  • Warning label next to or below solar breaker.

Directory Placard

  • Location: customer side of service panel, visible, not covering manufacturer labeling.
  • Must show: PV module qty, manufacturer, model and Inverter qty, manufacturer, model.
Custom Placards Required
1
Placards Notes
  • Use approved plaques (see plaque page on approved plans).
  • Placards must list inverter + panel make & model.
  • All placarding per SO 600-83, 84, 85, 86 (size, font, location, qty, manufacturer, model, equipment, conduit runs, etc.).
  • Directory Placard + plans must show installed equipment locations.
Non Standard Planset Requirements
Single Line Diagram,BOS Elevation

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes
  • At this time, the City of Banning does not allow the ground installation of solar facilities for commercial purposes in any zone.