City of Bakersfield (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 1
- Rough Inspection
- Footing inspection for > 10kW
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Center
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
- Pathways must be over supported roof structure (starting at load bearing wall, not eave) and cannot impede residential egress.
- Maximum use of eaves (edge of non-hip roofs) is 18 inches and must be clearly defined on the plans.
- Setbacks not required for flat roofs See file section for approved setback image
- A chimney cannot be completely boxed in by panels. We must provide access on at least one side of the chimney.
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Plans must have a space in the upper-righthand corner to allow the city to place their approval stamps, PE should NOT stamp this area.
Engineer stamped Structural Calculations required when installing on a patio cover or a flat roof.
Expedite form can only be used on system size at 10kw or smaller.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates,Load Relocation
- Allowed POI
- PV Breaker,Load Side Taps,Meter Adapter,Line Side Taps
- Panel Schedule Required
- All Projects
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
MUST MAINTAIN 3' SEPERATION BETWEEN EACH ESS UNIT
SEPERATE ESS DISCONNECTS NOT ALLOWED - AHJ WILL REJECT IF DESIGN SHOWS THIS.
BATTERY [PRODUCER'S STORAGE DEVICE(S) WILL NOT CAUSE THE HOST LOAD TO EXCEED ITS NORMAL PEAK DEMAND. NORMAL PEAK DEMAND IS DEFINED AS THE HIGHEST AMOUNT OF POWER REQUIRED FROM THE DISTRIBUTION SYSTEM BY PRODUCER'S COMPLETE FACILITIES WITHOUT THE INFLUENCE OR USE OF THE ENERGY STORAGE DEVICE(S).]
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- IF RELOCATING LOADS TO A SUBPANEL, ADD LOAD CALCULATIONS
- EXISTING SYSTEMS MUST BE REFLECTED ON PLANS/PLACARD & ELECTRICAL LOAD CALCS
- Site
- ILLUSTRATE EXISTING ARRAY AS A 'LAYOUT', SHOWING EACH INDIVIDUAL MODULE - NOT ONE COMBINED 'OBSTRUCTION'
- REPLICATE LAYOUT OF (E) MODULES IN AURORA BEFORE DOWNLOADING .DXF
- SHOW EXISTING ARRAY AND ADD LEADERS TO THE EXISTING ARRAY, INDICATING WHICH ARRAYS ARE EQUIPPED WITH RAPID SHUTDOWN ("RS COMPLIANT" , "NON-RS COMPLIANT")
- Informational: All solar installations must include a disconnect switch located within 10 feet of the inverter and within direct line of sight. This disconnect may be integrated into a load center or subpanel (not BUI). If the inverter is adjacent to the main service panel, an additional AC disconnect is not required. However, if the inverter is not within line of sight from the MSP, a disconnect must be installed within 10 feet of the inverter.
- Site Notes
- Roof Plan
- INCLUDE NOTE INDICATING LENGTH OF RAKE ON THE SITE PLAN USING A DIMENSION LINE
- SOLAR INSTALLATIONS ARE PERMITTED TO UTILIZE 18" OF THE RAKE IF USING STANDARD 2018 PATHWAYS
- IF RAKES ARE LARGER THAN 18" AND WE ARE INSTALLING MODULE ON THIS UNSUPPORTED PORTION, THEN WE MUST OFFSET THE SETBACK TO ONLY UTILIZE 18" OF THE RAKE
- WE MUST MAINTAIN 30" CLEARANCE AROUND ROOF MOUNTED AC UNITS
- Attachment Detail
- Attachment Detail Notes
ALL JOBS [ALUMINUM FLASHING SEALED WITH MASTIC]
- Electrical Diagram
- SHOW EV CHARGER AND CALL OUT WIRE SIZES FOR THE EV CHARGER
- For SEEB Projects: Utilize 100A AC Disconnect for 63A CHINT breaker.
- Electrical Diagram Notes
- Label Page
- PLACARDS NEED TO DELINEATE THE (N) AND (E) SYSTEMS. IF BOTH SHUTDOWN TYPES ARE USED, PLACARD ALSO NEED TO DELINEATE BETWEEN THE TWO ON THE PLACARD.
- IF THE EXISTING SYSTEM IS NON-RSD COMPLIANT, THIS MUST BE SHOWN ON THE PLACARD PAGE AND THE LINE DIAGRAM
- Label Page Notes
- Custom Placards Required
- 1
- Placards Notes
- Special shutdown placards, letters must be at least 3/8" high
- Backfeed Breakers require either hold down kit or special placard saying breaker remains energized when removed/turned off
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Allowable space is less than 45% for the Ground Mount.
- Setback Front Yard
- 10
- Setback Back Yard
- 20
- Setback Side Yard
- 10