Town of Sahuarita (AZ)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL FIRE CODE
2017 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE digital stamps on corresponding PV pages, PE Letter & Calcs. **PLEASE MAKE SURE THE PLANS ARE UNLOCKED BEFORE UPLOADING. AHJ WILL REJECT IF THEY CANNOT EDIT THE PDF TO PLACE THEIR OWN STAMP.**
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
PM required. Use Eaton If DC Disco required, use SQUARE D HU361RB. Inv > PM > Utility DG Disconnect > POI No published information about battery placement.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Panel specs must call out UL listing
- Electrical Diagram
If the manufacture allows 120% without engineer we would allow, if not engineer would be required.
3-line & 1-line required
Provide panel schedule if relocating loads
AHJ requests subpanel and combiner box model numbers to be listed on 3 and SLD as well as listed in title block in equipment section. See files section for reference
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Do you require ground mounts to have additional fencing or meshing protecting the array? No, calculations for footings (uplift) Depends On Location If Soil Sample Is Required, Rural Yes, Residential No