City of Yuma (AZ)

Arizona Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusNot accepted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2024 INTERNATIONAL PROPERTY MAINTENANCE CODE

2024 INTERNATIONAL EXISTING BUILDING CODE

2024 INTERNATIONAL RESIDENTIAL CODE

2024 INTERNATIONAL BUILDING CODE

2020 NFPA 70 NATIONAL ELECTRICAL CODE

AS ADOPTED BY CITY OF YUMA 

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Not accepted
How Many Plansets Required
Other (See Submission Notes)
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Flat roof structures without a parapet, shall have solar panel installations setback 3' from any roof edge fronting a public right of way

Structural & loads

Wind Speed
115
Wind Notes

WS: 115 - Must adhere to ASCE standards, Check address on tool for details.

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
0
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

AC Disconnect Conditional Criteria
Section 300 of the APS ESRM states that AC disconnect & PV meter equipment cannot be installed under a carport, breezeway, patio, porch, or any other area that can be enclosed.
Electrical Load Calcs Required
All Jobs
Allowed POI
Meter Adapter,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions


Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements
  • Provide spec sheets for any additional equipment such as load centers, MPUs, new subpanels. etc. 
  • HAVE CODES ONLY PRSENT ON CODE LIST, NOT ON LABELS PAGE. AHJ IS REQUESTED NOTHING ELSE BE ADDED.
  • All equipment shall be installed a minimum of 4 (four) feet above the existing grade.
  • (If Applicable) If property is located in the special flood hazard area. In order to determine if the project is a "substantial improvement" as defined as City of Yuma Ordinance No. O2006-52, please submit written documentation showing exact valuation of all equipment that will be installed.
Site

Section 300 of the APS ESRM states that AC disconnect & PV meter equipment cannot be installed under a carport, breezeway, patio, porch, or any other area that can be enclosed.

Roof Plan

Arrays that are adjacent to a public street right-of-way are required to maintain a three foot setback from the roofline OR be screened by an existing parapet. Solar installations shall not extend more than eight inches above the roof surface.

Roof Plan Notes

Roof Mount [FOR RACEWAY OR CABLE EXPOSED TO DIRECT SUNLIGHT ON OR ABOVE ROOFTOPS HAVE A CLEARANCE OF 7/8" NEC 310.15 (B)(2).]

Attachment Detail
  • Need to show side view showing max height from top of roof to top of module. To be no more than 8" max
  • Ballasted systems may not be installed if there is not a minimum 18" parapet along the entire roof edge.
Attachment Detail Notes

Roof Mount [Solar installations shall be parallel with the roof and shall not extend more than 8 inches above roof surface]

Electrical Diagram
  • Centerfed 120%: EE Stamp Required
  • Need to include photo of MSP, MSP labels, breakers, and riser in plans. Can be its own page
  • Provide feeder schedule for new sub panel
  • Provide panel schedule and loads for new panel
  • Unprotected conductors from utility side connection will need to be shown in rigid conduit between service and fussed disconnect
  • Tie in on hot/split bus panel not allowed
  • PW3: "Inverter A/C power shall not include battery backup, you may create a category to include the battery and solar A/C separate of the solar A/C power." 
  • For Enphase systems please make sure to include specific Combiner Box model number. This is to be updated on the SLD, Site Plans, and materials list
Label Page

ALL JOBS:

load calculations required for all projects even mpu's

  • DO NOT LEAVE CODE REFERENCE ON LABELS PAGE
  • An additional label needs to be added and shown on the signage sheet referring to the RAPID
  • SHUTDOWN SWITCH, and mounted on either the Main SES or the first disconnect to be within 3'
  • of the SES. The label needs to be red with white lettering.
  • Add note: LABELS TO BE ENGRAVED HARD PLASTIC AND MECHANICALLY FASTENED BY SCREWS OR RIVETS
  • NEC 690.13(B) Required Label: warning electric shock hazard terminals on the line and load side may be energized in the open position.
  • NEC 705.12(3)(4) Required Label: caution photovoltaic system circuit is backfeed.
  • When using a combiner panel, a label is required to identify the combiner panel and to state no additional loads to be added. 

DERATES:

  • Placard must be added listing the size of any derate: "MAIN BREAKER DE-RATED TO ____ AMPS. DO NOT INCREASE MAIN BREAKER RATING"

MPU:

  • Datasheet must be included

PCS:

Must always include PCS labeling when PCS settings are utilized: "THE MAXIMUM CURRENT BACKFEED BY THIS SYSTEM TO THE MAIN PANEL MAY BE CONTROLLED ELECTRONICALLY. REFER TO MANUFACTURER'S INSTRUCTIONS FOR MORE INFORMATION

PCS CONTROLLED CURRENT SETTING: ____ AMPS."

Custom Placards Required
0
Placards Notes
  • Must have an additional Rapid Shutdown Switch placard on each job.
  • Electrical shock hazard sticker must be shown on Disco and MSP
Non Standard Planset Requirements
Single Line Diagram

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

Only one footing detail, showing footing depth, is required on plans 09/23/21 Juco - Setback requirements entered per a past project DCR. This may be site specific. Use these parameters for the next plan set. If we receive another correction for setbacks that don't match my inputs, we will need to start calling for site specific setbacks for all GMs. Note: No rear yard setbacks were specified in the correction

Setback Front Yard
10
Setback Side Yard
7
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Yuma (AZ) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.