City of Globe (AZ)

Arizona Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredWet Structural,Wet Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL MECHANICAL CODE

2017 NATIONAL ELECTRIC CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
0
Rough Inspection
Racking Inspection
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Wet Structural,Wet Electrical
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Pathways must be over supported roof structure meaning setbacks start at a load bearing wall

Structural & loads

Wind Speed
90
Wind Notes

Exposure Category B

Snow Load
20
Snow Load Notes

Needs to show ground snow and roof snow (non reducible). The value for both is 20 lbs.

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

SE & EE wet stamps on all corresponding PV pages, PE Letter / Structural Calcs. Both must include expiration date. Structural Calcs - A letter from an engineer stating that the existing framing structure can support a 20 lb. snow load as well as the weight of the solar panel design: Include dimension of roof structure, spans, and spacing. All Calcs must be sealed. Call our roof structure calculations, must match existing roof framing members

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Electrical Diagram

Standard

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Globe (AZ) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.