City of Casa Grande (AZ)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2019 CASA GRANDE BUILDING AND TECHNICAL ADMINISTRATIVE CODE
2018 INTERNATIONAL SWIMMING POOL AND SPA CODE
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE FOR ONE- AND TWO-FAMILY DWELLINGS
2018 INTERNATIONAL MECHANICAL CODE
2017 NATIONAL ELECTRIC CODE
2018 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL FIRE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
- When electrical load calcs are required they must be stamped
- Stamp Location On Plans
- Center
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Show proper 36” firepath access from lowest street side and second firepath from a separate roof plane
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
- Structural Notes
- Add 2019 CITY OF CASA GRANDE BUILDING AND TECHNICAL ADMINISTRATIVE CODE to calculations.
- Add blank 2x2 box on top right corner for the AHJ to add their stamp.
- PE letter cannot call out "latest editions" of codes. It must specify the codes the AHJ has adopted. (2018 International codes)
- letters to have the full address, including the street direction
- Minimum Ground On Roof
- #6
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.87
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
No published information about battery placement.
- Separate ESS Disconnect Required
- Local Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- PLEASE DOUBLE CHECK TO MAKE SURE YOUR PDFS ARE FLATTEN BEFORE UPLOADING
- Do not submit plans with the TUV Rheinland PTL Certificate. This must be removed for all future submissions otherwise plans will receive a automatic kick back
- Plans MUST have a 2x2 box for the AHJ to add their stamp. This is NOT for the engineer stamp.
- Roof Plan
Clearly show the location and the label:
- PV Utility Disconnect
- Bi-Directional PV Production Meter
- Backup Loads Battery Disconnect
- Backup Loads (ESS) Meter
- Roof Plan Notes
All Jobs [EXISTING ROOF STRUCTURE IS ADEQUATE TO ADD THE PHOTOVOLTAIC SYSTEM]
- Electrical Diagram
- Centerfed 120% allowed with EE stamp
- One AND three line diagram
- LG Chem jobs, disco should read bi-directional
- Bonding Jumper in the Main Panel Required: Show a short conductor labeled “Grounding/Bonding Jumper per NEC 250.28” connecting the grounding bar to the panel enclosure.
- Label Page
For Derates: Placard must be added listing the size of any derate: "MAIN BREAKER DE-RATED TO ____ AMPS. DO NOT INCREASE MAIN BREAKER RATING"
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- Single Line Diagram
- Non Standard Revision Requirements
- Only red bubble the pages of the plans that are being revised. The AHJ is now charging $25 per page for revisions.
- Please remove any unchanged pages from planset.
Ground mount
- Ground Mount Fencing Required
- No